BeamerOne™ · Projection layout systems

Laser layout for
for Construction Pros

​BeamerOne™ projects your digital drawings onto floors, walls, and ceilings — with one-person operation and pinpoint accuracy.

TALK TO US

One-person operation

QA + 3D scan

1/8″ accuracy

Why crews switch

Layout in hours — not days

4×

Faster layout

Save days on every project.

1/8

Accuracy

Precise layout you can trust.

15,000

SF / day

Cover large areas in less time.

2,000

Points / day

Up to 50 points per projection.

Trusted on real jobsites

DPR Construction

Kiewit

Alpha Mechanical

Midwest Drywall

Flintco

Feldman Geospatial

Proven in the field

Proven results from the field

Hard numbers, measured against the crew's own estimates.

DPR Construction

Healthcare

15 → 3 days

Complex curved layout reduced from an estimated 15 days to 3 — 34,000 SF, no rework reported.

Alpha Mechanical

HOAG Hospital, Irvine

~20 days saved

Complex curved layout reduced from an estimated 15 days to 3 — 34,000 SF, no rework reported.

DPR Construction

Healthcare

MEP anchors

Complex curved layout reduced from an estimated 15 days to 3 — 34,000 SF, no rework reported.

See it on your own drawings

Bring a real project — we'll project it at full scale on your floor.

SEE IT IN ACTION
From model to floor

How it works

1

Upload your plan

2

Position the device

3

Project & build layout

4

Modify on-site

5

Capture as-built

From model to floor

What makes BeamerOne™
different

Projects on floors, walls & ceilings

— and uneven surfaces too.

Operated by one person

— no layout team needed.

Built-in QA & auto-alignment

— real-time accuracy.

Portable & fast setup

— reposition in minutes.

Compatible with AutoCAD

 — and more.

Not sure it fits your trade?

Tell us about your project and we'll walk it through with you.

Learn more
In their words

What teams say


LightYX technology is quickly becoming a game-changer for our construction team!

Paul Foley — President · Feldman Geospatial


Leasing LightYX is the best decision I made this year.

Carlos Dutra — Senior PM · Precision Dry Walls


It fundamentally changes the way we're able to lay out and use the information during an initial layout.

David Pounds — VP · Flintco Construction


We have a hard fact from site: LightYX reduced the layout time from 15 days to 2.5 days.

Project Manager · Saint-Gobain

In their words

Trusted at scale

103,000

Hours of R&D

40 + 4

U.S. states & EU countries in use

22M

SF of layout completed

In their words

Talk to us

Get a personalized demo with your real drawings. We'll project them at full scale.

Priority given to Work Emails.

Valid number

How many layout days do you typically have per month?*

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

One-person operation

QA + 3D scan

1/8″ accuracy