DOWNLOAD PLAN

Download the latest version of your plan to the mobile BeamerOne App.

02

POSITION DEVICE

Position the BeamerOne‏‏™ anywhere on-site using reference points or reference elements.

03

PROJECT & BUILD

Select any area to project, see your real scale layout and start working.

04

MODIFY PLAN ON-SITE

Modify in real-time on-site according to the as-built, and share with the architect.

05

CAPTURE AS BUILT DATA

Capture as-built information and update drawings accordingly, share & save.

06

MONITOR WORK

Get work progress report. Spot mistakes at the earliest stages of a project, before it’s too late.

LIGHTYX LASER LAYOUT BeamerOne™ System

White cloud icon with green arrow pointing away and white arrow pointing at the cloud

DESIGN TO SITE & SITE TO DESIGN WORKFLOW

LASER PROJECTED LAYOUT

HOW IT WORKS

Frame 12 (2).png
Green decoration element

DESIGN

LAYOUT

BUILD

CONTACT US

SCAN

• 3D Scanning

 

• We can scan elements on site, and they should appear on the drawing after being scanned.

 

• We can create control points on site for future positioning.

PROJECT

• Select a region to project inside the accurate projection circle.

• Mark & Build accurately

EDIT PLAN

• Sometimes, the actual construction doesn't precisely correspond to the drawing.

• We can perform an edit of the drawing using the app while on site.

• We can save the edits for “As built” documentsation

AS BUILT

• 3D Scanning and drawing changes are getting stored as an “As built” digital files that are stored on cloud and can be shared easily with all stakeholders such as Architect, VDC manager, Super intendent etc..

LIGHTYX SOLUTION - BeamerOne™ Easy User Interface

Design to Site & Site to Design workflow

construction worker marking the ceiling on the top of laser projection
Three construction workers marking the floor using laser projection
A photo of using LightYX app to control  digital layout

INTERESTED?

Contact us to get more details or to book a demonstration.

TALK TO US

"It's an extremely accurate and efficient machine..."

— Marco Tiberii , Union carpenter . Tightline Construction

" In half a day I've been able to lay out an 8,000 SQFTt retail space..."

— Mike Darcy , Project manager , Sachse construction

"It's probably gonna save me about 80% of the time for layout..."

— Lawrence Majcher, Drywall Superintendent , DPR construction