
Ceiling Hanger Point Layout for Large-Scale Project
13000
Hanger Points
59 → 9 Days
Layout Time Reduced
6x Faster
Than Manual Layout

CONTRACTOR
Saint Gobain
PROJECT
Commercial
TRADE
Celing Hanger points

Ceiling Hanger Point Layout Project
For the ZAC Euratlantique – Armagnac Sud – Ilot O project in Bordeaux, France, LightYX supported the layout of approximately 13,000 ceiling hanger points for the installation of floating ceiling elements.
Using full-scale laser projection, the layout was brought directly from the digital drawings to the jobsite surface, allowing the crew to identify and mark hanger point locations quickly and accurately. Instead of relying on traditional manual measuring and marking, the team used laser-projected points to accelerate the ceiling layout workflow and improve field execution.
The project demonstrated how LightYX can support large-scale ceiling installation by reducing layout time, improving marking consistency, and helping crews move faster across complex building areas.
LightYX reduced the estimated manual layout duration from 59 days to 9 days, saving approximately 50 working days on site. This represents an ~85% reduction in layout time compared with the traditional method.

PLEASE FILL IN YOUR
CONTACT DETAILS

DO YOU WANT TO SEE THE SAME RESULTS ON YOUR PROJECT? TRY US
Share a bit of information, and we'll connect you with a LightYX expert to explore our offerings. Discover how the LightYX platform can seamlessly integrate into your workflow for enhanced efficiency and precision

-Photoroom.avif)

