Ceiling Hanger Point Layout for Large-Scale Project

13000

Hanger Points

59 → 9 Days

Layout Time Reduced

6x Faster

Than Manual Layout

CONTRACTOR

Saint Gobain

PROJECT

Commercial

TRADE

Celing Hanger points

Ceiling Hanger Point Layout Project

For the ZAC Euratlantique – Armagnac Sud – Ilot O project in Bordeaux, France, LightYX supported the layout of approximately 13,000 ceiling hanger points for the installation of floating ceiling elements.

Using full-scale laser projection, the layout was brought directly from the digital drawings to the jobsite surface, allowing the crew to identify and mark hanger point locations quickly and accurately. Instead of relying on traditional manual measuring and marking, the team used laser-projected points to accelerate the ceiling layout workflow and improve field execution.

The project demonstrated how LightYX can support large-scale ceiling installation by reducing layout time, improving marking consistency, and helping crews move faster across complex building areas.

LightYX reduced the estimated manual layout duration from 59 days to 9 days, saving approximately 50 working days on site. This represents an ~85% reduction in layout time compared with the traditional method.

Project part Area (SF) Layout output-points marked Layout output-lines marked (LF) Crew size LightYX duration Estimated manual duration* Time saved Man hour saved Layout productivity boost
Cancer Center 13,000 layout points 1 workers 9 day 59 days 50 days 650%

PLEASE FILL IN YOUR
CONTACT DETAILS

Priority given to Work Emails.

Valid number

How many layout days do you typically have per month?*

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

DO YOU WANT TO SEE THE SAME RESULTS ON YOUR PROJECT? TRY US

Share a bit of information, and we'll connect you with a LightYX expert to explore our offerings. Discover how the LightYX platform can seamlessly integrate into your workflow for enhanced efficiency and precision