google-site-verification: google5ac77c9621b5a9bf.html
top of page

Speeding up retail projects


$300,000

Lorem ipsum dolor sit amet, consectetur

80%

Lorem ipsum dolor sit amet, consectetur

100%

Lorem ipsum dolor sit amet, consectetur

contractor

Project

trade

Project scope:

Alpha Mechanical tapped LightYX BeamerOne to handle complex mechanical layout deliverables for the Cartier – Troy Somerset retail project. By bringing digital design directly onto the jobsite with laser-accurate projection, the team accelerated HVAC anchor and strap layout — reducing manual work and rework while keeping the schedule on track


Project challenge:

Traditional mechanical layout for HVAC anchors and straps often relies on manual measurement tools — tape measures, cut-sheets, and total stations — resulting in:

  • slow pace when marking thousands of layout points

  • increased risk of human error

  • schedule delays due to rework and coordination checks

Alpha Mechanical needed a more efficient way to translate digital design into the field with consistency and speed.


LightYX Solution & Workflow:

LightYX BeamerOne™ was used to:

  1. Import the mechanical BIM/CAD files into the LightYX app.

  2. Set up the BeamerOne on site with reference control points.

  3. Laser-project layout points directly on the floor and walls for anchor and strap locations.

  4. Organize work by component type (straps, anchors, etc.) using layer separation.

  5. Extend layout coverage even in congested or hard-to-reach zones.


Crew Efficiency: With only 2 layout workers, LightYX delivered high-speed, high-accuracy mechanical point placement that would traditionally and  QA require a larger team or multiple days see the table.


Project part

Area (SF)

Layout output-points marked

Layout output-lines marked (LF)

Crew size

LightYX duration

Estimated manual duration*

Time saved

Man hour saved

Layout productivity boost

Cancer Center

66,000

6,301 layout points

2 workers

1 day

4-6 days

3-5 days


400%

Women’s Health

66,000

4,822 layout points

2 workers

1 day

3-5 days

2-4 days




BnWoffice background.jpg
8.jpg

Select the country code and enter valid number

PLEASE FILL IN YOUR CONTACT DETAILS

Green shape as a part of page decoration

do you want to see the saME RESULTS ON YOUR PROJECT? TRY US

Share a bit of information, and we'll connect you with a LightYX expert to explore our offerings. Discover how the LightYX platform can seamlessly integrate into your workflow for enhanced efficiency and precision

bottom of page