Project scope:

Alpha Mechanical tapped LightYX BeamerOne to handle complex mechanical layout deliverables for the Cartier – Troy Somerset retail project. By bringing digital design directly onto the jobsite with laser-accurate projection, the team accelerated HVAC anchor and strap layout — reducing manual work and rework while keeping the schedule on track

Project challenge:

Traditional mechanical layout for HVAC anchors and straps often relies on manual measurement tools — tape measures, cut-sheets, and total stations — resulting in:

  • slow pace when marking thousands of layout points
  • increased risk of human error
  • schedule delays due to rework and coordination checks

Alpha Mechanical needed a more efficient way to translate digital design into the field with consistency and speed.

LightYX Solution & Workflow:

LightYX BeamerOne™ was used to:

  1. Import the mechanical BIM/CAD files into the LightYX app.
  2. Set up the BeamerOne on site with reference control points.
  3. Laser-project layout points directly on the floor and walls for anchor and strap locations.
  4. Organize work by component type (straps, anchors, etc.) using layer separation.
  5. Extend layout coverage even in congested or hard-to-reach zones.

Crew Efficiency: With only 2 layout workers, LightYX delivered high-speed, high-accuracy mechanical point placement that would traditionally and  QA require a larger team or multiple days see the table.

Project part Area (SF) Layout output-points marked Layout output-lines marked (LF) Crew size LightYX duration Estimated manual duration* Time saved Man hour saved Layout productivity boost
Cancer Center 66,000 6,301 layout points 2 workers 1 day 4-6 days 3-5 days 400%
Women's Health 66,000 4,822 layout points 2 workers 1 day 3-5 days 2-4 days

LightYX technology is quickly becoming a game-changer for our construction team!

Paul Foley, President,
Feldman Geospatial

PLEASE FILL IN YOUR
CONTACT DETAILS

Priority given to Work Emails.

Valid number

How many layout days do you typically have per month?*

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

DO YOU WANT TO SEE THE SAME RESULTS ON YOUR PROJECT? TRY US

Share a bit of information, and we'll connect you with a LightYX expert to explore our offerings. Discover how the LightYX platform can seamlessly integrate into your workflow for enhanced efficiency and precision